The aim of the study is to revise the CAR's forestry code and its implementing texts in line with both the guidelines set out in the forestry policy approved in 2021 and the international commitments made by the CAR (national timber processing in line with the CEMAC decision, international Forest-Climate rules, FLEGT VPA agreements). |
|
| Study on the updating of the Forestry Code |
|
| |
| | |
|
The objective of the assignment is to provide technical and management support to the Dominica Geothermal Development Company Ltd. (DGDC) to ensure the successful delivery of the construction of the new transmission network at 69 kV and 33 kV connecting the planned 15 MW geothermal power plant to the existing grid. The success of the Project will be assessed by the delivery of this new infrastructure on schedule, within budget and according to technical, environmental and social standards. The Owner’s Engineer is expected to (i) perform preliminary surveys and the corresponding scoping, cost estimate and engineering design work for transmission lines and substations; prepare the procurement plan, bidding documents for each procurement package, including technical specifications; (ii) support DGDC in the bidding process (iii) support DGDC for contract management and carry out construction supervision, and (iv) support DGDC during the guarantee period. |
|
| Owner’s Engineer for Design, Procurement and Construction Supervision of the transmission network |
|
| |
| | |
|
The Knowledge Hub for expertise on Youth provides expertise and knowledge to EC HQ services and EU Delegations worldwide in the area of youth in external action (youth participation an empowerment, as well as youth specific issues in sectoral policies). The Hub supports sector-specific policies and the formulation of actions in the area of youth and provides support on the implementation of the Youth Action Plan as well as on the management of the Youth Sounding Board for international partnerships. The Hub is a flexible mechanism which provides on demand expertise to EC staff worldwide, and to a certain extent, to Member States’ staff. |
|
| Knowledge Hub for Expertise on Youth |
|
| |
| | |
|
The aim of the Technical Cooperation Facility (TCF) is to increase the effectiveness of the EU Delegation and its partners in implementing current and future EU cooperation programmes in Tunisia. The specific objectives of this contract are as follows: (i) Strengthen the various phases of the cooperation project cycle (including the formulation, identification, implementation and monitoring of programmes and projects), (ii) Strengthen political dialogue (and sectoral political dialogue) between the EU and Tunisia, (iii) Strengthen the capacity of line ministries and other stakeholders to implement and monitor programmes, and (iv) Facilitate the coordination and visibility of the Team Europe Initiatives (TEI) and other joint initiatives. |
|
| Technical assistance to support the implementation of EU cooperation programmes in Tunisia |
|
| |
| | |
|
This action supports the implementation and coordination of the EU programmes in Timor Leste and enhances the partnership and development cooperation. Specifically, it: (i) supports the improvement of the coordination of the EU cooperation strategies, (ii) enhances the capacity of line ministries to ensure effective implementation of EU strategies, policies and projects, and (iii) increases the capacity of all relevant stakeholders to develop actions in the framework of the Global Gateway and the Indo-Pacific Strategy. |
|
| EU-Timor Leste Cooperation Facility |
|
| |
| | |
|
French Development Agency |
| The objective of this mission is to provide a cartography of the water supply networks in the city of Enugu in Nigeria, based on an inventory of the existing water supply network and of its infrastructures by means of field investigations. After having defined a GIS suitable to the type of data and users, establishment of a mapping/cartography of the inventory in a GIS (on QGIS software), and provision of support to ESWC staff through training and periodic technical assistance to enable the efficient use of the GIS. |
|
| Cartography of the water supply networks in the city of Enugu |
|
| |
| | |
|
|