Studies, control and supervision of the construction works for the interconnection of the Cameroon and Chad power grids (PIRECT)
Cameroon
2024-2029 | African Development Bank
Project Management Consultancy mission to the SONATREL Project Management Unit for the implementation of the regional component of the Interconnection Project of the Cameroon and Chad Power Grids. In Cameroon, the planned works include the construction of 650km of 225kV line, the construction of 3 substations (225/30kV) and the extension of 2 substations (225/110/30kV and 225/90/15kV), as well as the rural electrification of more than 400 communities along the HVB line.
The Ginger SOFRECO/RTEi consortium, as the Project Management Consultant, is responsible for: i) updating the preliminary and detailed design studies, the ESIA and RAP studies and the hazard studies; ii) drawing up the tender documents and assisting with the procurement process; and iii) monitoring and supervising the works (HV line, substation and rural electrification), including monitoring the implementation of environmental and social protection activities, and providing assistance during the warranty period.