Owner’s Engineer for Design, Procurement and Construction Supervision of the transmission network
Dominica
2022-2025 | World Bank
The objective of the assignment is to provide technical and management support to the Dominica Geothermal Development Company Ltd. (DGDC) to ensure the successful delivery of the construction of the new transmission network at 69 kV and 33 kV connecting the planned 15 MW geothermal power plant to the existing grid. The success of the Project will be assessed by the delivery of this new infrastructure on schedule, within budget and according to technical, environmental and social standards.
The Owner’s Engineer is expected to (i) perform preliminary surveys and the corresponding scoping, cost estimate and engineering design work for transmission lines and substations; prepare the procurement plan, bidding documents for each procurement package, including technical specifications; (ii) support DGDC in the bidding process (iii) support DGDC for contract management and carry out construction supervision, and (iv) support DGDC during the guarantee period.