Millennium Challenge Corporation |
| The MCA - Senegal II Transmission Network Modernisation and Reinforcement Project (Transmission Project), for the benefit of SENELEC, will result in the construction of 16 km of 225 kV submarine cables, 31 km of 225 kV underground cables and 2 new 225 kV substations, as well as the installation of 5 new 80 MVA transformers. Within the framework of this project, the Consultant is in charge of the following activities: - Carrying out detailed designs and environmental and social impact assessments (ESIA); - Preparation of Resettlement Action Plans (RAP) in accordance with the Resettlement Policy Framework (RPF); - Economic and financial analysis and assistance to MCA - Senegal II in defining the monitoring and evaluation framework; - Preparation of tender documents (including environmental, social and health and safety clauses) for the construction works and implementation of the RAP; - Assistance in the procurement and hiring of contractors; - Construction supervision. |
|
| Design services, preparation of tender documents and supervision of works for the high-voltage power transmission project |
|
| |
| | |
|
The aim of the Technical Cooperation Facility (TCF) is to increase the effectiveness of the EU Delegation and its partners in implementing current and future EU cooperation programmes in Tunisia. The specific objectives of this contract are as follows: (i) Strengthen the various phases of the cooperation project cycle (including the formulation, identification, implementation and monitoring of programmes and projects), (ii) Strengthen political dialogue (and sectoral political dialogue) between the EU and Tunisia, (iii) Strengthen the capacity of line ministries and other stakeholders to implement and monitor programmes, and (iv) Facilitate the coordination and visibility of the Team Europe Initiatives (TEI) and other joint initiatives. |
|
| Technical assistance to support the implementation of EU cooperation programmes in Tunisia |
|
| |
| | |
|
Technical assistance for: i) the development, structuring and monitoring of water user associations (WUAs) and their umbrella bodies for the management of built and rehabilitated irrigation schemes, ii) the management of electronic vouchers to boost agricultural production, iii) the creation of an Agricultural Technology Innovation Centre, and iv) communication and awareness-raising among target populations. |
|
| Technical assistance for the transfer of management of irrigated lands to farmers, access to services and the establishment of a technological innovation centre (Bénoué Valley Development and Investment Valorisation Project - VIVA Bénoué) |
|
| |
| | |
|
Project Management Consultancy mission to the SONATREL Project Management Unit for the implementation of the regional component of the Interconnection Project of the Cameroon and Chad Power Grids. In Cameroon, the planned works include the construction of 650km of 225kV line, the construction of 3 substations (225/30kV) and the extension of 2 substations (225/110/30kV and 225/90/15kV), as well as the rural electrification of more than 400 communities along the HVB line. The Ginger SOFRECO/RTEi consortium, as the Project Management Consultant, is responsible for: i) updating the preliminary and detailed design studies, the ESIA and RAP studies and the hazard studies; ii) drawing up the tender documents and assisting with the procurement process; and iii) monitoring and supervising the works (HV line, substation and rural electrification), including monitoring the implementation of environmental and social protection activities, and providing assistance during the warranty period. |
|
| Studies, control and supervision of the construction works for the interconnection of the Cameroon and Chad power grids (PIRECT) |
|
| |
| | |
|
Millennium Challenge Corporation |
| Conduct of design studies, environmental and social assessments and supervision of the construction and rehabilitation of the MV and LV networks of the ACCES project. |
|
| Consulting Engineer for the ACCES project (detailed design, detailed ESIA, preparation and implementation of RAP, construction tender documents and the construction supervision option) |
|
| |
| | |
|
French Development Agency |
| The objective of this mission is to provide a cartography of the water supply networks in the city of Enugu in Nigeria, based on an inventory of the existing water supply network and of its infrastructures by means of field investigations. After having defined a GIS suitable to the type of data and users, establishment of a mapping/cartography of the inventory in a GIS (on QGIS software), and provision of support to ESWC staff through training and periodic technical assistance to enable the efficient use of the GIS. |
|
| Cartography of the water supply networks in the city of Enugu |
|
| |
| | |
|
|