| | | | Ginger SOFRECO is a highly international company in terms of its clients, its partners, the nationalities of its experts, its headquarters staff and its presence in numerous countries.
|
|
| | | | |
| | | | We have three types of clients: governments, administrations and public bodies; public and private companies; multilateral and bilateral development funding agencies.
|
|
| | | | |
| | | | Ginger SOFRECO employs several hundred senior and junior experts of various nationalities, the vast majority of whom are technical specialists
|
|
| | | | |
|
Côte d'Ivoire, Nigeria, Ghana, Togo, Benin |
Technical Assistance to the ECOWAS Commission for the Study on the Abidjan-Lagos Corridor Highway (2020-2024) |
The 1,028-km six-lane homogeneous Highway from Abidjan to Lagos is a major Transport Infrastructure Project for Western Africa. The ECOWAS Commission ensures the implementation of the technical studies and related activities. These large-scale engineering studies, coupled with the development of a construction strategy and motorway operating procedures through PPP, are complex services to handle by contracting authorities and involve significant budgets. Furthermore, three Design and Engineering (D&E) firms are contracted to carry out the technical studies, dividing the corridor into three lots and requiring strong supervision to ensure effective coordination of the studies. Therefore, the aim of the Technical Assistance (TA) Services is to: (i) support the PIU with the diverse nature of studies being pursued under the Programme, (ii) serve as an interface with all stakeholders, (iii) support ECOWAS in anticipating urgent actions, and (iv) take the necessary decisions regarding technical, legal and financial expertise to allow ECOWAS and the authorised agencies of Member States to effectively manage all phases of each service component provided for in the study. |
| Study of wind measurement using a meteorological mast in the Port of Cotonou (2024-2025) |
The aim of the project is to determine the viability of wind turbine installations with rotors 155 metres high. The aim of the consultation is to collect and analyse wind data over a continuous period of at least 12 months, at a height of 120 metres. The expected results include: (i) the installation, operation and removal of a wind measurement device, (ii) measurements in accordance with international Measnet standards, (iii) a full report on the measurement campaign, and (iv) reliable, bankable data for preliminary analysis. |
| Diagnostic study of the judicial and penitentiary systems (2007-2008) |
Analysis of the judicial and penitentiary systems, Recommendations for the reform of these systems and proposals for priority actions. Identification of accompanying actions (institutional tools and mechanisms, as well as the financing modes of the judicial and penitentiary systems, the quantity and quality of human resources, management and programming capacity, monitoring and evaluation, the adequacy of available material and infrastructures). |
| Final evaluation of the Public Administration Reform Support Programme (PARAP) (2011-2012) |
The overall objective of this study was to conduct an ex-post evaluation of the PARAP in order to draw lessons from the project's implementation and recommendations for the 10th EDF administration reform project. |
| Continuation of supervision of construction work on the ''Electricity Distribution'' project, transferred to the Beninese Electricity Company (SBEE) by MCA-Benin II. (2023-2025) |
The MCA-Benin II Project was completed by the closing date of the Compact on 22 June 2023, with the exception of the contract for the IPP connections of the EIFFAGE/RMT Contractor. The post-completion supervision activity focuses on the removal of reservations and the correction of defects during the Defect Notification Period, in collaboration with the SBEE teams. The current assignment is aimed at supervising the construction work on the connections for the four IPP solar power plants, as well as the removal of reservations for the other contracts, in accordance with standards and contractual requirements. |
| Training course on ''Setting up projects: needs, feasibility and financing'' (2024) |
The assignment was to train an official from the Interprofessional Fund for Agricultural Research and Consultancy (FIRCA) on the subject of ''Setting up projects: needs, feasibility and financing''. The aim of this five-day coaching course was to enhance the theoretical and technical skills and knowledge required to set up a project. |
| Review of the implementation of the Project to Support the Justice Sector Programme (PAPSJ), 10th EDF (2011) |
The overall objective of this assignment was to take stock of the implementation of the Project to Support the Justice Sector Programme (PAPSJ) funded under the 10th EDF. |
| Feasibility study for the installation of pilot ore processing sites (2021-2022) |
Feasibility study for the installation of pilot sites for gold processing (artisanal or semi-mechanised mining), aimed at limiting the use of toxic reagents: implementation of a cyanide-free processing flowsheet, local consultations on the acceptability of the pilot studies and an economic feasibility study. |
| | | | |
| | | |