| |
Consulting - Engineering - Training |
|
| |
|
| |
| | | |
References by geographical area |
|
References by field of expertise |
|
| | | | Ginger SOFRECO is a highly international company in terms of its clients, its partners, the nationalities of its experts, its headquarters staff and its presence in numerous countries.
|
|
| | | | |
| | | | We have three types of clients: governments, administrations and public bodies; public and private companies; multilateral and bilateral development funding agencies.
|
|
| | | | |
| | | | Ginger SOFRECO employs several hundred senior and junior experts of various nationalities, the vast majority of whom are technical specialists
|
|
| | | | |
|
Diagnostic study of Niger's current water resource situation within the framework of PANGIRE (National Integrated Water Resource Management Action Plan) (2014-2015) |
The general objective of this study was to identify the stakes and challenges of the integrated management of Niger’s water resources through six thematic studies prior to the development of the PANGIRE. |
| Control and supervision of the rural electrification works of the Project for the interconnection of the electricity networks of Côte d’Ivoire, Liberia, Sierra Leone and Guinea / Guinea rural electrification component (2020-2022) |
In the framework of the project for the interconnection of the electricity networks of Côte d’Ivoire, Liberia, Sierra Leone and Guinea, leading to the construction of a 1357 km, 225 kV double circuit transmission line to connect the 4 national electricity networks, a rural electrification component is planned for the populations living near the 225 kV line. SOFRECO is carrying out the control and supervision of the execution of the entire rural electrification component for the contracting authority (Électricité de Guinée). The works being carried include the construction of approximately 77 km of LV lines, 202 km of 33 kV MV lines, 32 substations of 100 kVa, 2 substations of 160 kVa and the supply of 2000 pre-pay meters and connection materials. |
| Millennium Challenge Corporation |
Preparation of texts revising the legislative and regulatory framework: electricity code, law on the regulator and their enforcement regulations (2019-2021) |
The mission’s general objective is to contribute to the adoption of an attractive legal and regulatory framework with the introduction of an electricity code and of a new law on the regulator to build rules and practices more conducive to private investment in order to achieve universal access by 2025 and supply affordable electricity. In particular, the mission involves defining, justifying and documenting amendments to the regulations to be integrated into the draft electricity code or other text to provide an investment-friendly framework in the energy sector covering the development of renewable energies, public-private partnerships, incentive optimisation, the optimisation of the model and acceleration of the rural electrification process, and finally, taking account of the downstream sector in the oil and gas industry. |
| Zagtouli photovoltaic plant, phase 2 (17 MWc) – Technical assistance and support with procurement (2019-2022) |
The overall objective of the second phase of the project to build the Zagtouli 17 MWc photovoltaic solar plant is to help develop the generation of cost-effective renewable electricity in Burkina Faso. This project is taking place under an EPC (engineering, procurement and construction) turnkey contract, and will bring the capacity of the Zagtouli plant to 50 MWc. In the framework of this contract, SOFRECO is providing technical assistance and procurement support to the project promoter, SONABEL, Burkina Faso’s national electricity company, from the review of the studies through to the contractual arrangements with the Constructor. |
| Mining legislation and taxation, training and capacity building, mining cadastre and management of mining titles (2003-2004) |
Implementation of Component A of the project to strengthen the state's capacities in the mining sector and in environmental resources management, drafting of law enforcement texts for the mining code adopted on 8 May 2003. |
| Formulation of a fisheries and aquaculture policy document and preparation of a management plan for the Nangbeto dam lake fisheries (2011) |
Support to Togo authorities in the creation of a national fisheries and aquaculture policy framework paper, including a national strategy for the development and management of fishery resources, and the formulation of a Nangbetto lake fisheries management plan. |
| Strengthening of the state's capacities in the mining sector and in environmental resources management. (1999-2003) |
The project includes the following tasks : drafting of law enforcement texts for the 1997 mining law, environmental regulation, studies for mining tax system enforcement. Creation and management of a computerised mining land register, training. Design of a documentation and information centre on the mining industry. Study tours. |
| Development of a national fisheries policy framework for Burkina Faso and preparation of a national fisheries and aquaculture policy document for Mali (2011) |
This assignment is part of a programme whose overall objective is to contribute to the sustainable and equitable management of fisheries in an effort to reduce poverty and improve food security in ACP countries. The specific objective of the ACP Fish II programme is to strengthen the development and implementation of a sectoral fisheries policy in ACP countries. The specific objectives of this assignment are the following: - Support Burkino Faso authorities in the development of a national fisheries and aquaculture policy document intended to set the short, medium and long term objectives of the fisheries and aquaculture sector and to determine the strategies necessary to fulfil them; - Support Mali authorities in the development of a national fisheries and aquaculture policy document that sets out the orientations and objectives of the fisheries and aquaculture sector, and in defining the strategies and actions to be undertaken in order to accomplish these objectives. |
| | | | |
| | | |
92-98, boulevard Victor Hugo - 92115 CLICHY Cedex - FRANCE - Tel. +33.1.41.27.95.95
|
| | |
|
|